JAVA MINI PROJECTS JAVA PROJECTS

Java Projects on Project Work Tracking System

Java Projects on Project Work Tracking System

ABSTRACT:
This venture is going to mechanize the status following of different tasks managed by Enterprise programming Solutions. This framework normally empowers the best level administration to monitor the status of the ventures under their control. A portion of the basic exercises that can be performed with this framework are checking the consummation status of undertaking archives, to caution PL’s demonstrating the reports culmination dates. PL dispenses activities to TL, PL of a specific customer with venture code, venture name and begin date of the specific undertaking. The framework keeps tracks of the reports that must be finished within a specific length. Mail framework is actualized in this task which empowers successful correspondence amongst PL, TL, and TM. PL can transfer records to Team individuals and particular TM can see, download and erase the same up to his needs. PL can refresh, erase the activities to his needs and he can discharge specialists from the venture once in the event that it is done. The framework helps the PL, TL, TM to see the status of the undertaking and aides in following data about the venture.
1. SYSTEM ANALYSIS 
2.1 Feasibility Study
In the plausibility ponder stage, the practicality of the task is broke down, and a legitimate arrangement is advanced, with an exceptionally broad arrangement for the venture and some cost gauges, for possibility examination is operational specialized and temperate.
Operational practicality
Operational practicality is taken a gander at in perspective of arrangement fitting in with current operations, this trial of plausibility asks, regardless of whether the framework will work when created and introduced?
Is their adequate help for the venture from the administration?
Are present business strategies satisfactory to the clients?
In what capacity will the arrangement influence the end clients work condition?
Will it create any poor outcome in any regard?
This undertaking has adequate help from the administration. The end client’s workplace is furnished with this product. They are prepared to acknowledge this product thus it is behaviorally attainable since the undertaking can be taken care of effectively.
Specialized plausibility
Specialized plausibility examinations whether the required innovation and labor is accessible or not, this trial of practicality inquires.
Is the innovation required for the proposed framework accessible?
Could the framework be extended and created?
Are their certifications of exactness, unwavering quality, straightforward entry and information security?
The innovation and the labor for the proposed framework are accessible thus it is actually plausible.
Monetary possibility
The product being made should yield benefits, more noteworthy than the Cost of consumption in making the product, the product with respect to its goal is concerned, will unquestionably yield better natural products, as it is intended to manage cash and different sources of info and yield of the framework. Likewise, the framework Greatly lessens the time factor it additionally decreases the upkeep cost of the records essentially.
PROPOSED SYSTEM 
This framework is utilized to track the undertaking status.The primary concern utilized as a part of the task is the mail framework. These statuses and reports can undoubtedly be shared among the Project Leader, Team Leader, and Project Leader. The System is kept up by J2EE innovation. The pieces of information are put away in database consequently.
2.5 ADVANTAGES OF PROPOSED SYSTEM
• Documents can be dispersed to the specific customer effortlessly.
• Security can be given, with the goal that the clients just view the status.
• Reportage is made simpler.
• Effective Mailing framework empowers unwavering quality.
• It takes less preparing time.
• The process includes full got adaptability.
• Data recovery is quicker by utilizing J2EE innovation.
Attainability STUDY
2.1 FEASIBILITY STUDY
Amid the attainability think about, the possibility of the undertaking – the probability of the proposed framework is dissected.
The achievability thinks about was done on the generally coordinated bundle. Three key thought in engaged with the achievability investigation are Operational, Technical and Economical.
Operational Feasibility
The primary goal here is to see if
 The framework will work once it is created and introduced.
 There is adequate help for the undertaking from the administration.
 The current business strategies are satisfactory to the clients.
An examination is led and thus the accompanying conclusions are inferred.
 There is adequate help frame the administrative level
 The current strategies are done physically and take part of the time.
 The people engaged with the present working framework are met and talks are held with them to advance a framework with which they have great investments and premium.
Specialized attainability
Mechanical plausibility examinations the accompanying territories.
 Technology and labor are accessible are most certainly not.
 Capacity to hold the information that is required to utilize the new framework.
 Provision to react to clients paying little heed to their number and area.
 Provision for encourage extension.
 Guarantee of exactness, unwavering quality, straightforward entry and information security.
An examination is directed and subsequently, the accompanying conclusions are determined.
 The important innovation to execute the proposed framework is accessible in the association.
 Main equipment hardware, for example, PCs with the required Capacities is likewise accessible.
Subsequently, the framework is in fact attainable.
Sparing Feasibility
Issues to be considered in the sparing practicality are
 Financial benefits must equivalent or surpass the expenses.
 The arrangement ought to be practical.
 Must be worth to seek after the undertaking.
EXISTING SYSTEM 
In the current framework, an employee can refresh their report physically in without fail. In this undertaking, the Team part can report their detail each time physically to Team Leader. Group Leader see their detail and refresh their points of interest to the Project Leader physically. PL utilized the XL sheet to refresh physically. The task pioneer refreshes entire modules in to single extend physically in unfailingly. This is finished by each time everyday report.
2.3 DRAWBACKS OF EXISTING SYSTEM
• The Maintenance of pieces of information in MS-EXCEL.
• All reports are done physically.
• Various counts are done physically.
It brings about long handling time.
HARDWARE CONFIGURATION 
3.1 H/W System Configuration
Processor – Pentium – III
Speed – 1.1 GHz
Smash – 256 MB (min)
Hard Disk – 20 GB
Floppy Drive – 1.44 MB
Console – Standard Windows Keyboard
Mouse – Two or Three Button Mouse
Screen – SVGA
SOFTWARE CONFIGURATION 
Working SYSTEM: Windows XP.
TECHNOLOGY: Java Server Pages (JSP).
DATABASE: MS-ACCESS (or) MY SQL.
WEB SERVER: Apache Tomcat 6.0.

Download Project: Project Work Tracking System

Leave a Reply

Your email address will not be published. Required fields are marked *