.NET MINI PROJECTS .NET PROJECTS

ASP Project On Patient Management System

ASP Project On Patient Management System

ABSTRACT:

In a given day, a number of patients visit a healing facility or a center. Numerous healing facilities in India still deal with the patient information physically.

Healing centers will have the capacity to spare cash and time on the off chance that they have a decent programming program for dealing with patient’s information.

The thought is to create electronic patient administration programming that can be utilized to monitor the patients enlisting in a healing center or facility.

Specialists and the rooms accessible in a healing facility can be overseen utilizing this framework.

Likewise, this framework should bolster getting to the past visit histories of any patient, look for patients by name and so on.

A couple of focuses to be noted about the framework we are creating here

• A patient can be sorted as “In understanding” or “Out Patient”. In the event, that patient sort is “In Patient”, a bed will be doled out to the patient.

• A specialist will be doled out to every patient before the patient meets the specialist. Just a single specialist can be appointed to a patient at a given time.

• A patient can visit the healing center any number of times

The imperative parts related to the framework would be:

Manager: Administrator will have finish control of the framework. She/he jars Add/Edit/Delete patients, Add/Edit/Delete Doctors, Add/Edit/Delete Beds, Search for patients, Assign patients to specialists.

Specialist: Doctor can get to a patient’s record and refresh his perceptions about the patient in that specific visit.

Reports: The accompanying reports can be created. You can actualize more reports which you think can be valuable.

• Utilization of specialists

• List of Patients analyzed by an ailment

• List of patients who went by amid a given day and age

EXISTING SYSTEM:

 Cannot Upload and Download the most recent updates.

 No utilization of Web Services and Removing.

 Risk of blunder and of information when the task is a work in progress.

 Less Security.

 No appropriate coordination between various Applications and Users.

 Fewer Users – Friendly.

PROPOSED SYSTEM:

The advancement of the new framework contains the accompanying exercises, which endeavor to computerize the whole procedure keeping in perspective of the database reconciliation approach.

 User neighborliness is given in the application different controls.

 The framework makes the general venture administration significantly less demanding and adaptable.

 Readily transfer the most recent updates, enables a client to download the alarms by tapping the URL.

 There is no danger of information botch at any level while the undertaking advancement is under process.

 It furnishes abnormal state of security with various level of confirmation.

MODULES:

1. Administration

2. Employee

3. Doctor

4. Reports

5. Authentication

HIGHLIGHTS:

Make an electronic Patient Management System (PMS) for a healing center with the accompanying highlights

• Registration – This component permits to include/alter/erase patients in the framework.

• Patient Management – Before we let a client visit a specialist, we ought to order whether he is an in-understanding or an outpatient. At that point, fundamental manifestations ought to be caught and entered in the framework. Existing patients can be sought by name, affirmation date, quiet ID and so forth.

• Patient Visit History – Previous visit histories of the patient can be gotten to

• Assign Doctor – Assign a patient to a specialist in light of the essential data of the patient’s issues. In view of the specialization and accessibility of the specialists, patients ought to be allocated.

• Doctor Management – Add/Edit/Delete the specialists working in the healing center.

• Bed/Room Management – The beds or rooms in a healing center can be overseen. Include/Edit/Update the rooms with points of interest. Check accessibility and relegate a space to in-patients.

• Doctors can refresh the patient’s record with their perceptions

Watchwords:

• Generic Technology Keywords: Databases, User Interface, Programming

• Specific Technology Keywords: ASP.Net, C#.Net, MS SQL Server

• Project Type Keywords: Analysis, Design, Implementation, Testing

• SDLC Keywords: Presentation, Business, Data Access Layers

Condition:

• Servers:

• Operating System Server: – Microsoft Windows 2000 or Higher

• Data Base Server: Microsoft SQL Server 2000/2005

• Clients: Microsoft Internet Explorer,

• Tools: Microsoft Visual Studio.Net

• User Interface: ASP.NET with AJAX

• Code Behind: VC#.NET

HARDWARE REQUIREMENTS:

Number Description

1 PC with 2 GB hard-circle and 256 MB RAM

SOFTWARE REQUIREMENTS:

Number Description

1 Windows 2000/XP/or Higher with MS-office

2. MS-SQL server2000/2005

3. MS-Visual Studio.Net 2005

4. MS-Internet Explorer

• Manpower necessities:

3To 4 Developers can finish this in 3-4 months.

Turning points:

No. Milestone Name Milestone Description

COMMENTS:

1 Requirements Specification Complete detail of the framework including characterizing progressive systems constitutes this turning point. An archive specifying the same ought to be composed and an introduction to that be made. Attempt ought to be made to include some more important usefulness other than those that are recorded in this report.

2 Technology familiarization Understanding of the innovation expected to execute the undertaking. The introduction ought to be from the perspective of having the capacity to apply it to the undertaking, as opposed to from a hypothetical point of view.

3 Database creation A database of no less than 10 passages of clients with no less than 1 should application admin. It is vital to finish on the database at this stage itself so advancement and testing can continue with the genuine database itself.

4 High-level and Detailed Design Listing down every single conceivable situation and after that surfacing with stream outlines or pseudo code to deal with the scenario. The situations should guide to the prerequisite determination

5 Development of front end functionalities. Usage of the principle screen giving the login, the screen that takes after the login giving different choices, screens for every one of the choices During this development period, it would be a smart thought for the group to begin dealing with a test-get ready for the whole framework. This test-plan can be refreshed as and when new situations ring a bell.

6 Integrating the front-end with the database The front-end created in the before the point of reference will now have the capacity to refresh the database. Different highlights ought to be useful at this stage. To put it plainly, the framework ought to be prepared for coordination testing.

7 Integration Testing The framework ought to be altogether tried by running all the experiments composed of the framework (from development 5). Another 2 weeks ought to be there to deal with any issues found amid testing of the framework. From that point forward, the last demo can be masterminded.

8 Final Review Issues found amid the past turning point are settled and the framework is prepared for the last review. During the last survey of the task, it ought to be watched that every one of the necessities indicated amid development number 1 are satisfied

The accompanying advances will be useful to begin off the venture:

• Study and be alright with advances, for example, ASP.Net with C#, and SQL Server.

• Gather some information of item chains of importance and support before beginning the plan.

• Create a client database with various access levels.

• Start with making the login screen.

• Create menus for route and gathering the functionalities as sub menus.

• Create the assistance pages of the application as FAQ. This will helps the client.

DOWNLOAD: PATIENT MANAGEMENT SYSTEM

Leave a Reply

Your email address will not be published. Required fields are marked *